Question 1
Quadrilateral $ABCD$ is inscribed in a circle (cyclic quadrilateral). If $\angle A = 110^\circ$, what is the measure of the opposite angle $\angle C$ (in degrees)?
Grade 7
14 câu phong cách IMC Practice · Grade 7 (14 câu) (14 điền đáp số · 90 phút) · Gồm 1 câu đố tư duy độc bản · Không lặp lại dạng toán trong cùng 1 đề.
✦ Điểm nhấn: Question 14 — Hai đàn cừu gặm cỏ hết đống rơm nào nhanh hơn?
14 câu · 90 phút. Đáp án và lời giải sẽ hiện sau khi nộp bài.
Quadrilateral $ABCD$ is inscribed in a circle (cyclic quadrilateral). If $\angle A = 110^\circ$, what is the measure of the opposite angle $\angle C$ (in degrees)?
A cylinder has radius $r = 6\text{ cm}$ and height $h = 5\text{ cm}$. If its curved lateral surface area is $k\pi\text{ cm}^2$, find $k$.
If $M(x_M, y_M)$ is the midpoint of the segment connecting $A(3, 2)$ and $B(9, 6)$, find $x_M + y_M$.
Solve for $x$: $\sqrt{4x + 0} = 6$.
In $\triangle ABC$, $\widehat{A} = 50^\circ$. The exterior angle bisectors of $\widehat{B}$ and $\widehat{C}$ meet at $J$. Find the measure (in degrees) of $\widehat{BJC}$.
Suppose $\dfrac{x}{2} = \dfrac{y}{3} = \dfrac{z}{4}$ and $3x + 3y - z = 66$. Find the value of $x + y + z$.
If $f(x) = 3x + 7$, what is $f(f(3))$?
How many odd positive divisors does $300$ have?
Pipe A can fill a tank in $12$ hours, and Pipe B can fill the same tank in $24$ hours. How many hours will it take to fill the tank if both pipes are open together?
How many even positive divisors does $360$ have?
A right triangle has legs $a = 15$ and $b = 20$, and hypotenuse $c = 25$. What is the length of the altitude drawn to the hypotenuse?
There are $61$ matches on a table. Two players take turns removing between $3$ and $5$ matches (inclusive) from the pile. The player who cannot make a legal move (when fewer than $3$ matches remain) loses. How many matches must the first player take on the first turn to guarantee a win?
Let $x, y > 0$ satisfy $x + y = 3$. Find the minimum value of $$P = \dfrac{4}{x} + \dfrac{16}{y}$$
A ranch has $8$ identical bales of hay and $8$ sheep: Sheep 1 eats $1$ bale in $1$ day, Sheep 2 takes $2$ days, Sheep 3 takes $3$ days, ..., and Sheep 8 takes $8$ days. Which team finishes $1$ bale faster when working together simultaneously: (A) Sheep 1 and 2, or (B) Sheep 3, 4, 5, 6, 7, and 8?